Bunkers, Bunkers, Bunkers!

As of today all four of the new bunkers have their general shapes and contours.  After meeting with architect Kevin Ramsey from the Ronald Fream Design Group this morning he was very pleased with the way the bunkers were turning out.  He made some subtle changes to some of the high points of the slopes and informed us we were good to go!  So far this week we have installed drainage sumps on #4 and #14, drain tile and irrigation have also been installed in the bunker on #4.  Irrigation and drainage should be complete for all 4 bunkers by Thursday, once this is complete we can begin to cut out the edges of the bunkers, backfilling with sand and installing the sod.
Drainage Sump #14

Drainage Sump #14 Backfilled with 2-4 inch Rock

Drain tile being installed at #4

#4 Drainage Complete

Bunker irrigation being installed at #4