Tuesday, March 29, 2011

Bunkers, Bunkers, Bunkers!

As of today all four of the new bunkers have their general shapes and contours.  After meeting with architect Kevin Ramsey from the Ronald Fream Design Group this morning he was very pleased with the way the bunkers were turning out.  He made some subtle changes to some of the high points of the slopes and informed us we were good to go!  So far this week we have installed drainage sumps on #4 and #14, drain tile and irrigation have also been installed in the bunker on #4.  Irrigation and drainage should be complete for all 4 bunkers by Thursday, once this is complete we can begin to cut out the edges of the bunkers, backfilling with sand and installing the sod.
Drainage Sump #14

Drainage Sump #14 Backfilled with 2-4 inch Rock

Drain tile being installed at #4

#4 Drainage Complete

Bunker irrigation being installed at #4

Sunday, March 27, 2011

New Bunkers

New bunkers are currently being built on holes #4, #14, #16 and #18.  These new bunkers should help give the course a current feel while maintaining a classic style much like the existing bunkers.  The rough grade of the bunkers is almost complete and should be finished Monday morning.  Drianage, sand, irrigation and sod will be installed this week.  I will keep everyone updated as we work through the final stages of this project.


#18 Rough Grade

#4 Being Shaped

#14 Being Shaped

#18 Being Shaped

#16 Rough Grade

Saturday, March 26, 2011

New Blog

Welcome!  This blog was created to furthur show the membership daily operations, projects and information on the golf course.  Here we will be posting daily activites and pictures of the golf course so that you are able to stay up to date on what is happening wherever you are.  I hope you enjoy this new addition to El Paso Country Club.